公告日期:112年5月12日(星期五)
Subject: Water pipe renovation project of the female 1st dorm
Construction date: 2023/5/15 8:00-17:00
Construction site: Boiler room on the top floor of female 1st dorm
Note:
1.During construction period, hot water in the female 1st dorm will be suspended.
2.Normal usage will be restored immediately after the repair is completed.
3.Sorry for the inconvenience, thank you for your cooperation.
主旨:女一舍管路整修工程
施工日期:2023/5/15 8:00-17:00
施工地點:女一舍頂樓鍋爐室
說明:
1.施工期間女一舍熱水暫停使用。
2.維修完畢將立即恢復正常使用。
3.造成不便請見諒,謝謝您的合作。
學生事務處宿舍服務組 Student Housing Service Section